Publicité

Instructions / Instructions de montage / Instrucciones
S009SBU
S010SBU
NICE
S011SBU
S013SBU

Publicité

Table des Matières
loading

Sommaire des Matières pour Fantini Rubinetti NICE S009SBU

  • Page 1 NICE Instructions / Instructions de montage / Instrucciones S009SBU S011SBU S010SBU S013SBU...
  • Page 2: Pre-Installation

    PRE-INSTALLATION - PRÉ-INSTALLATION - PREINSTALACIÓN S009SBU+M011AU 5 7/8" 5 1/8" 3 1/4" - 4" 2 1/2" 3 1/8" 1 3/4" 1/4" 7/8" 12 1/4" [inch] 5 1/8" S011SBU+MO11AU 2 3/8" 5 1/8" 7 7/8" 2 1/2" 1 5/8" 1/2 NPT 1/2 NPT 3 1/4"...
  • Page 3 PRE-INSTALLATION - PRÉ-INSTALLATION - PREINSTALACIÓN S010SBU+M011AU 7 5/8" 5 7/8" 5 1/8" 3 1/4" - 4" 3 1/8" 1 3/4" 7/8" 1/4" 12 1/4" 2 3/8" 5 1/8" [inch] S013SBU+MO11AU 1 5/8" 1/2 NPT 7 7/8" 1/2 NPT 7 5/8" 8 5/8"...
  • Page 4: Installation - Instalación

    INSTALLATION - INSTALLATION - INSTALACIÓN NECESSARY TOOLS - OUTILS NÉCESSAIRES - HERRAMIENTAS NECESARIAS TEFLON 55/64” 1 3/16” 5/64” 5/16” 25/64”...
  • Page 5: Technical Details

    TECHNICAL DETAILS - DONNÉES TECHNIQUES - DATOS TÉCNICOS Minimum pressure Pression minimum Pression mínima 1 BAR Maximum pressure Pression maximum Pression máxima 10 BAR Recommended working pressure Pression optimale de service Pression de trab. aconsejada 2-5 BAR Max. water temperature Température maximum Temperatura máxima 80°...
  • Page 6 INSTALLATION - INSTALLATION - INSTALACIÓN S009SBU S011SBU pag. 7 pag. 7 S010SBU S013SBU pag. 16 pag. 16...
  • Page 7 INSTALLATION - INSTALLATION - INSTALACIÓN S009SBU S011SBU 2 mm...
  • Page 8 INSTALLATION - INSTALLATION - INSTALACIÓN 1 3/16” 25/64...
  • Page 9 INSTALLATION - INSTALLATION - INSTALACIÓN ~10 / ~12 Nm 55/64”...
  • Page 10 INSTALLATION - INSTALLATION - INSTALACIÓN silicon O-ring O-ring...
  • Page 11 INSTALLATION - INSTALLATION - INSTALACIÓN 5/64” 5/16”...
  • Page 12 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 13 INSTALLATION - INSTALLATION - INSTALACIÓN METAL...
  • Page 14 INSTALLATION - INSTALLATION - INSTALACIÓN 5/16” silicon 5/64”...
  • Page 15 INSTALLATION - INSTALLATION - INSTALACIÓN silicon O-ring O-ring...
  • Page 16 INSTALLATION - INSTALLATION - INSTALACIÓN S010SBU S013SBU 2 mm...
  • Page 17 INSTALLATION - INSTALLATION - INSTALACIÓN 1 3/16” 25/64...
  • Page 18 INSTALLATION - INSTALLATION - INSTALACIÓN ~10 / ~12 Nm 55/64”...
  • Page 19 INSTALLATION - INSTALLATION - INSTALACIÓN 5/16”...
  • Page 20 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 21 INSTALLATION - INSTALLATION - INSTALACIÓN METAL...
  • Page 22 INSTALLATION - INSTALLATION - INSTALACIÓN 5/16” silicon 5/64”...
  • Page 23 INSTALLATION - INSTALLATION - INSTALACIÓN silicon O-ring...
  • Page 24 INSTALLATION - INSTALLATION - INSTALACIÓN 5/64”...
  • Page 25 INSTALLATION - INSTALLATION - INSTALACIÓN...
  • Page 26 - UTILISATION - USO On first use or following prolonged periods of inactivity, do not use the first half-litre of drinking water dispensed. Shut off the plumbing system in the event of a long absence. Check the water-tightness regularly. Lors de la première utilisation ou après une longue période de non utilisation, ne pas consommer le premier demi-litre d’eau potable qui sort du robinet.
  • Page 27: Nettoyage - Limpieza

    CLEANING - NETTOYAGE - LIMPIEZA Clean the surfaces using a soft cloth soaked in liquid soap diluted in water, then rinse and dry thoroughly. Never use detergents containing abrasive substances or containing muriatic acid, vinegar, ammonia, acetone, bleach, domestic acids, disinfectants in general or abrasive sponges. CAUTION! The use of products other than those recommended may damage the surfaces irreparably, in which case the manufacturer will not be held liable.
  • Page 28 Fratelli Fantini SpA via Buonarroti, 4 Pella (NO) Italia T +39 0322 918411 r.a. F +39 0322 969530 fantini@fantini.it www.fantini.it...

Ce manuel est également adapté pour:

Nice s010sbuNice s011sbuNice s013sbuNice m011au

Table des Matières