Installation Requirements - FS S1900-24T Guide De Démarrage Rapide

Switch
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Requirements

Before you begin the installation, make sure that you have the following:
Desktop mounting: ESD bracelet (or ESD gloves).
Wall mounting: ESD bracelet (or ESD gloves), ladder, marker, hammer drill, rubber hammer,
screwdriver.
Rack mounting: ESD bracelet (or ESD gloves), Phillips screwdriver, M6 Screws, Standard-sized 19"
wide rack with a minimum of 1U height available.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 40°C.
The installation site must be well ventilated. Ensure that there is adequate air flow around
the switch.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
3

Publicité

Table des Matières
loading

Table des Matières