Supplies Required; Connect Water Supply - Bradley S19-120SS Installation

Douche d'urgence horizontale acier inox
Masquer les pouces Voir aussi pour S19-120SS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Supplies Required

• Pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• Sign-mounting hardware
Assemble components
1. Assemble the components as shown on page 4.
2. Apply pipe sealant to all male-threaded pipe joints.
3. Bottom edge of showerhead should be 84" (2134
mm) from the floor.

Connect water supply

NOTICE! Do not rely on Bradley's Drench Shower to
support supply piping.
1. Connect water supply piping to 1" NPT inlet on
unit (piping supplied by installer). Provide adequate
supports (supplied by installer) for supply pipe using
pipe hangers or other means.
2. Mount the safety sign to the wall using sign-mounting
hardware supplied by installer.
Bradley • 215-279 Rev. L: ECO 19-05-034A
15¾" (400mm)
1½"
(38mm)
84"
(2134mm)
to Floor
2/15/2021
S19-120SS
87¾"
(2229mm)
to Floor
91¹⁄₁₆"
(2313mm)
to Floor
63¹⁄₁₆"
(1601mm)
to Floor
3

Publicité

Table des Matières
loading

Table des Matières