GRE SF133 Manuel D'instructions page 4

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
INSTALATION OF BARRIER
PROLOGUE
WARNING: THE BARRIER CAN ONLY BE INSTALLED ON A SOLID, FIRM AND, IF POSSIBLE, THICK BASE. THE
IDEAL SURFACE FOR THE INSTALLATION OF THE BARRIER IS A CONCRETE LAYER.
• Make sure you leave enough space surrounding the pool in order to be able to work without any problems.
• The surface must be clean and dry in order to be able distinguish clearly the marks made on the surface
• Do not begin to install the barrier if weather conditions are not optimal. You will have to use electrical devices, such as
hammer drills. Out of precaution, do not use these devices in the rain or on damp surfaces. In all cases, electrical devices
must be connected to a power socket equipped with a reverse current circuit breaker of 30 mA.
1. ESTABLISHING A STARTING POINT
Use a rope for the straight parts so that the layout is completely rectilinear.
2. TRACE THE 4 MARKS TO DESIGNATE THE 4 POLES OF THE FIRST PANEL
Using the two opposing holes of the template provided or a measuring tape, mark the 4 holes of the first panel, moving
the template from the last hole marked.
FIGURE 1
Distance 100 cm (39,4'')
IMPORTANT: In the case that the barrier has to be installed on a bend, the distance must be adjusted around 5
mm, upwards or downwards, in order to achieve the desired net tension (see diagram in paragraph 3).
3. MAKING THE HOLES
The holes must be made with drill bit 16 ø . If the initial hole is made using the drill bit 10 ø then it may be easier to carry
out the definitive drilling with 16 ø .
• With the help of a spirit level, make the holes that have been marked following these instructions:
If the holes are in a straight line, they should all be at a 90º angle from the deck.
FIGURE A
STRAIGHT LINE
Swimming pool
POLE

Publicité

Table des Matières
loading

Table des Matières