STANLine BOX 4G Manuel Utilisateur page 8

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
EN
Preparing the power cable
Remove the power cable insulation
(inside the cover, 1 cm +/- 2 mm) to
connect the Faston connectors.
Connecting the Faston connectors
Connect the Faston connectors to
the 2 pins in the left hole (no mounting
direction).
Installing the left cover
Screw the cover (4 M3 screws and
washers) by adjusting the length of the
cable (inside the hole). Screw the cable
gland onto the cable.
8
STEPS
7
8
9

Publicité

Table des Matières
loading

Table des Matières