Check points after installation work

After installation work, please double-check the points below. If there is any troubles, it must be done correctly.
(1) Check points - Unit installation
Is the insulation rapped around the outside ducts?
Is the outside ducts installed correctly?
(2) Check points - Wiring work
Is the power supply voltage correct?
Is the wiring work the same as wiring diagram?
Is the power supply cable connected to the terminal (TM1) certainly?
Is the PG connecter used for the power supply cable?
Is the connecter on the circuit board connected certainly?
Is the ground cable connected to the terminal certainly?
(3) Check points - Switch setting
Is the Main / Sub selection switch (SW1) set correctly?
Are the Address setting switches (SA1 and SA2) set correctly?
Are the Function setting switches (SW2 and SW5) set correctly?
[Refer to Installing the Lossnay unit]
[Refer to Installation example]
[Refer to wiring diagram]
[Refer to wiring diagram]
[Refer to Connecting the power supply cable]
[Refer to Connecting the power supply cable]
[Refer to Connecting the power supply cable]
[Refer to Connecting the power supply cable]
[Refer to When operating multiple Lossnay units]
[Refer to Function settings]
[Refer to Function settings]
page 3
page 3
page 5 - 6
page 5 - 6
page 7
page 7
page 7
page 7
page 8
page 10
page 11 - 12

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Lgh-f470rx5-eLgh-f600rx5-eLgh-f1200rx5-e

Table des Matières