Commissioning

4
Commissioning
4.1

System Manufacturer Information

The responsible fitter shall explain to the user how the hot water heater functions and how to operate it.
He shall explain how important regular servicing is, and that the lifespan and functionality are dependent on this.
If there is a risk of frost or it is being decommissioned, the heater must be drained.
Water seeps from the safety valve during the heat-up phase; this is completely normal.
Do not close the safety valve!
The user receives all of the accompanying documentation.
4.2

Putting Into Operation

4.2.1

General Information

Commissioning must be carried out by the device manufacturer or an assigned expert. The heater must be commissioned in accordance with the
corresponding installation instructions.
4.2.2

Filling the Heater

Before filling for the first time, the piping network must be rinsed out while the heater is connected. With the hot water tap open, the heater must be
filled until water escapes. Check the screw connections are all properly sealed and tighten if necessary.
4.3

Decommissioning

The heater must be decommissioned according to the heating device operating instructions. The heater should be drained if there is a risk of frost
damage and when decommissioning.