Télécharger Imprimer la page

Best IPB9IQT48SB Mode D'emploi page 11

Publicité

5. Fix the elctrical plate with 4 screws
(3.9x9.5mm) to the hood, the screws are
located in the Hardware Package (Fig. 8)
CONNECT DECORATIVE FLUE
DUCTED INSTALLATION ONLY
Note: Rooms with 10 or 11 foot ceilings
require flue extension model AEIPB9SB,
available from your local dealer. Discard
the upper flue supplied with the range
hood and replace it with the longer flue
extension.
1. Insert the upper flue in the support frame
(Fig. 9).
2. Mount the hood to the ceiling using the (4)
previously installed 6x70mm screws.
Tighten these screws. Install (2) additional
6x70mm screws
illustration. Make sure all (6) screws are
secure.
3. Secure the hood to the ceiling and install
the (2) additional screws (6x70mm).
INSTALL SUPPORT SYSTEM
1. Adjust the overall height of the support
frame. Loosen and re-tighten the 4 screws
in the height adjustment slots as
necessary. Insert 8 screws (3.9x9.5mm), 4
screws (M5x20mm) and 4 washers
(D.5.2x15mm) located in the Hardware
Package (Fig. 10).
as shown in the
MOUNTING
SCREWS
3,9x9,5mm
MOUNTING
SCREWS
3,9x9,5mm
MOUNTING
SCREWS
3,9x9,5mm
WASHERS
Ø 5,2x15mm
- 11 -
MOUNTING
SCREWS
3,9x9,5mm
FIG.9
MOUNTING SCREWS M5x20mm
FIG.8
FIG.10

Publicité

loading

Ce manuel est également adapté pour:

Ipb9 serieIpb9e48sb