Installation
Installation
Installation requirements
Installation
Connecting tool
The tool should, via its correct Power Focus drive unit, be connected to the
mains, 230V/50Hz alternatively 115V/ 60Hz, single phase. See instructions for
your Power Focus drive unit.
Tool display
The tool display is turned on from the controller.
On Power Focus 4000:
• Push the Prog button
• Use the navigation buttons to follow the path > Tool > Configuration > Ac-
cessory bus > ST bus > Mode
Socket release function
It is recommended to use the socket release function on all the ETP ST101
tools. When the function is enabled, the socket rotates backwards 3
completed tightening. The aim is to reduce tension on the reaction bar and to
make it easier to remove the tool.
The socket release function is turned on from the controller.
On Power Focus 4000:
• Push the Prog button
• Use the navigation buttons to follow the path > Pset > Programming+ > Op-
tions > Socket release > Mode On
Grounding
If the tool is mounted in a handheld or hand guided fixture, the fixture should
be connected to the drive using a separate 2.5mm
Installation instructions
Fitting of the tool cable
• Security check that the cable type is correct
• Align the cable connector using the two asymmetrically positioned heads on
the connector to fit in the slots in the tool handle.
• Tighten the lock nut.
• Security check that the connection is correct by pulling, pushing and turning
the cable connector (there should be no movement).
The tool has a built in electronic memory chip that will transmit the torque
transducer calibration value and angle pulses to the POWER FOCUS/drive
unit. Any changes made of these values in the POWER FOCUS while the
tool is connected will be stored in the tool memory.
6
EN
2
grounding cable.
© Atlas Copco Industrial Technique AB - 9836 843700 00
ETVST101-370-HAD
o
after a