Télécharger Imprimer la page

Atag HG6111H Notice D'utilisation page 11

Publicité

Les langues disponibles

Les langues disponibles

Building in dimensions
Saw the opening in the worktop. This should be
done very accurately (see ill.). Also saw out
any partitions that may be present. Ensure that
there is sufficient space allowed at the sides
and at the back. Ensure that there is a clear
space with a height of at least 15 mm below the
hob.
510
48
620
560
480
min.40
Please note:
The distance between the hob and the rear
wall must be at least 40 mm.
clearance required
Building-in
1. Make a hole in the side of the kitchen
cabinet to enable the gas pipe to be passed
through.
2. Stick the strips of sealant to the underside
of the hob (see above).
I
Situation
strip of
sealant
B
A
securing the front
B
A
II
Situation
A
C
3. Place the appliance in the cut-out.
4. Secure the hob by tightening screw (A) to
secure clamp (B or C) (see below).
strip of
sealant
A
C
C
A
securing the rear
strip of
sealant

Publicité

loading