ASSEMBLY PREPARATION
EN
TO PREVENT INJURY, READ AND UNDERSTAND THE
GREENHOUSE ASSEMBLY INSTRUCTIONS BEFORE USE.
Notes:
1. It takes about 1-2 hours to assemble the greenhouse by 2-3
persons.
2.The UV-protected side of the sheet is covered with opal white
film and must face towards the sun.
3.Remove approximately 2 inches of film from all sheet edges
before installing.Removing all film immediately after the
construction is completed
4.Make sure the greenhouse is located on a flat, level surface.
GENERAL SAFETY, WARNINGS AND PRECAUTIONS
KEEP WORK AREA CLEAN AND DRY.
Cluttered, damp or wet work areas invite injuries.
STAY ALERT. Watch what you are doing at all times. Use common
sense. Do not use the greenhouse when you are tired or
distracted from the job at hand. It is recommended to use gloves
for assembling the greenhouse.
MAINTAIN THIS PRODUCT WITH CARE.
Keep the greenhouse clean and dry for better performance:
maintenance should be performed regularly.
USE THE RIGHT PRODUCT FOR THE JOB.
Do not attempt to force a small product to do the work of a larger
industrial product. There are certain applications for which the
greenhouse was designed. It will do the job better and more
safely in the manner for which it was intended. Do not modify the
greenhouse and do not use the greenhouse for a purpose for
which it was not intended.
MAINTAIN A SAFE WORKING ENVIRONMENT.
Keep the work area tidy. Make sure there is adequate
surrounding
workspace. Avoid high traffic areas. Always keep the work area
free of obstructions, grease, oil, trash and other debris.
PROPER GREENHOUSE LOCATION.
Make sure the greenhouse is located on a flat, level surface.