Télécharger Imprimer la page

GreenWorks Pro BLB484 Manuel D'opérateur page 7

Masquer les pouces Voir aussi pour BLB484:

Publicité

Les langues disponibles

Les langues disponibles

10.2
INSTALL THE TRIGGER HANDLE
1. Move the trigger handle (11) onto the connecting tube
(6).
2. Use knob to tighten the screw.
10.3
INSTALL THE CONNECTING
TUBE
12
English
11
6
13
1. Align the rib (12) on the connecting tube with the slot
(13) in the flexible tube.
2. Put the end of the connecting tube (6) into the flexible
tube.
3. Push the connecting tube into the flexible tube.
4. Put the hose clamp (14) around the flexible tube.
5. Install and tighten the available screw into the hose clamp
(14).
10.4
INSTALL THE REAR BLOWER
TUBE
5
1. Align the grooves on the rear blower tube (5) with the
tabs on the connecting tube (6).
7
EN
14
6

Publicité

loading

Ce manuel est également adapté pour:

Bpb80l00Bpb80l411