CONTAINER INSTALLATION
1. Install containers on support frame, overlapping
containers at center tube.
2. Close cover and lock latch handle over support
tubes.
NOTE: One container should always overlap the other
container at the center tube.
CHUTE / HOOD INSTALLATION
Push upper chute through the gasketed opening in the
cover assembly.
Cover Inlet
8
ASSEMBLY