Télécharger Imprimer la page

Miele professional PT 8807 EL Plan D'installation page 13

Publicité

Technical datasheet
Tumble dryer:
Heating:
Legend:
Optional extras:
BS
Concrete base
Quality and density of concrete must comply with load.
Concrete base must be firmly secured to floor!
Recommended height
Minimum height
Width min.
Depth min.
Machine connections:
Electrical
Standard voltage (as supplied)
connection
Electrical connection must comply with national regulations.
Connection using multi-pole wall lockable socket in
compliance with IEC/EN 60309 and IEC/EN 60947 is
recommended in order to simplify electrical tests.
If machines are hard-wired, a multi-pole mains switch must be
provided on site.
A wall socket or main isolator must be accessible after
installation.
Installation plan: PT 8807 EL (electric)
Date: 01.2015
Abbreviations in bold type:
Connection required
Abbreviations in circle with dashes:
Connection optional or required depending on model version
Frequency
Rated load
Fuse rating
Cable screw connector
Connection cable
PT 8807
Electric (EL)
en - CA
3 15/16"
100 mm
2"
50 mm
47 ¼"
1200 mm
55 1/8"
1400 mm
V
3 AC 208V
Hz
60
kW
27.4
A
3 × 90
M 50
Supplied without
power cord
Page: 13

Publicité

loading