Télécharger Imprimer la page

Lamborghini Caloreclima EM 9/2-E Notice D'installation Et D'entretien page 35

Publicité

Les langues disponibles
  • FR

Les langues disponibles

WIRING DIAGRAMS
WIRING DIAGRAM - EM 9/2-E BURNER
The connections to be carried out by the installer are:
- Main supply line
- Thermostatic line
- Lock-out lamp at terminal S3 (if present)
- First stage hour counter at terminal B4 (if present)
- Second stage hour counter at terminal 2 of 3-pole plug (if present)
- Flame modulation thermostat at terminals 1-3 of 3-pole plug (if present) (remove the bridge)
Legend
EC
Control electrode
F
Fuse
FA
Anti-interference filter
IG
Main switch
MB
Burner motor
MS
Servocontrol terminal board
LKS 120
NOTE: Always make sure that no more than two wires are connected to each terminal.
Warning:
- Do not invert the neutral with the phase.
- Make the connection to an efficient earthing system.
- The electrical power line to the burner must be fitted with an omnipolar switch with an opening of at least 3 mm between
the contacts.
- The earth connection to the terminal board of the burner must be made with a cable at least 20 mm longer than the phase
and neutral cables.
- Must be workmanlike performed and comply with the regulations in force.
MPE Control box terminal board
MV
Detachable terminal
PA
Air pressure switch
PGm Minimum gas pressure switch
TC
Boiler thermostat
Tmf
2nd stage modulation thermo-
stat (if present)
- 35
-
Mains supply
230V-50Hz
TR
Ignition transformer
TS
Safety thermostat
VP
Main safety valve
VS
2nd safety valve

Publicité

loading

Ce manuel est également adapté pour:

Em 16/2-eEm 26/2-e