In case of operation the automotive-
lift, the chapter „ Safety regulati-
ons" and "Operating instruction"
must be observed.
• Raise the lift until the supports can be removed. Press
the button "lifting"
• Remove the supports.
• Lower the lift into the lowest position. (See chap-
ter 5.2). Fasten the ratchet-strip.
• Raise the lift and hang the spring into ratchet strip.
Pic 6:Hang the spring into the ratchet-strip
• Lower the lift into the ratchet. (press the button „lowe-
ring" and pull the lever down-wards).
• Adjust the columns again with a water bubble.
• Fasten the dowels with a torque key.
• Fasten the ramps and the safety device at the end of
the rail.
• Adjust the sliding guidance at the crossbeam (approx.
4-5 mm movement between the sliding guidance and
the column).
• Adjust regular height of the rails at all of the four co-
lumns by moving the nuts, which fix the carrying ropes
in the head plate. For demanded measuring accuracy
of all important vehicle manufacturer it is necessary to
install the lift very exactly and to line it up. For this to the
following points should be paid attention.
• Lift the automotive lift to eye level and lower it down in
the ratchet (refer to operating instructions).
Rope route
OPI_COMBI LIFT 480H_V4.2_DE-EN-FR-IT – Teile-Nr: 0030173
8.3 Changing the assembly location
To change the assembly location the pre-conditions must
be met according to the assembly guidelines. The location
change is to be done according to the following sequence:
• Remove the spring at the ratchet-strip.
• Lower the lift in the lowest position
• Loosen and remove the ratchet-strip. If necessary, pull
back the ratchet manually.
• Remove the cover of the Oil tank and remove the oil.
• Raise the lift on a working height. Press the button „lif-
ting"
• Lower the lift until the rails are lay on the erection tre-
stles.
• Disconnect the power supply.
• Disconnect the hydraulic hoses.
• Loosen and remove the dowels.
• Loosen and remove the screws of the crossbeam.
• Transport the automotive-lift to the its new location
• Install the lift in accordance with chapter 9 " Installation
and Initiation".
Use new anchors. The old anchors
are no longer fit for purpose!
Before recommissioning, a safety inspection must be
i
done by a specialist (use the regular safety inspection
form).
8.4 Initiation
i
Before the initiation a security check must be carried
out. Therefore use the form: First security check.
If the lift is installed by a competent person, he or she is
to perform the security check. If the operator installs the
lift by him or herself, he or she must instruct a competent
person to perform the security check.
The competent confirms the faultless function of the lift in
the installation record and the form for the security check
and authorises the use of the lift.
i
Please send the completed installation record to the
manufacturer after installation.
83