Télécharger Imprimer la page

Nussbaum COMBI LIFT 480H Manuel D'exploitation page 76

Publicité

Les langues disponibles

Les langues disponibles

Made
in
Germany
3.6 Electrical circuit diagram
Grounding according to local regulations
Before commissioning check whether the nominal motor
current matches the motor protection relay. Check all ter-
minal points for proper connection and that all contact
screws are tight.
Before commissioning, check all wiring and controls for
proper function. Do not permit commissioning from the
unauthorized side.
These plans were generated on a CAD system. To keep
plans to the current state, we ask that you request Nuss-
baum to make the changes.
These circuit diagrams are intellectual property. They may
not be given to third parties or reproduced without our
permission!
Rights to make changes are retained.
Circuit diagram and switch documents
Circuit diagrams were made to the best of our knowledge.
No warranty for the correctness of provided circuit dia-
grams and switch documents is given. This is particularly
relevant for switches that were completed by us according
to third party plans. This was done by us from purchaser
provided manufacturer documentation.
Functional test of switch systems
Circuit diagrams are not standard documents. When che-
cking the control cabinet at the factory, field devices such
as sensors, thermostats and motors cannot be included.
For this reason, even with careful inspection, functional
and switch errors cannot always be prevented.
Deficiencies are removed within the scope of guaran-
tee during commissioning. During commissioning, if our
services are not used, then no deficiency liability is ac-
cepted. Rework, including informing of circuit diagrams
of switch systems not commissioned by us are therefore
only done to an invoice according to our service terms
and conditions. Costs for rework by third parties cannot
be hounored.
76
Safety inspection and safety measures
The control cabinet has been produced, set up and in-
spected according to recognised technology rules accor-
ding to VDE0113/VDE0100/0600 and accident pre-
vention regulation DGUV  A3 (electrical systems and
equipment)
The following tests were done:
• Voltage test and/or insulation test of the control cabinet
• Inspection of effectiveness of the safety measures used
for indirect contact
• Functional test and part test
Implemented safety measures:
Protection against direct and indirect contact
See chapter 3.6 in the
i
german version for the
diagrams.
OPI_COMBI LIFT 480H_V4.2_DE-EN-FR-IT – Teile-Nr: 0030173

Publicité

loading