2.6 Choice of flue gas and air connection placement
The following steps must be observed when converting the external air connection:
1. Drill out the existing 3mm
holes with a 6mm drill (6x)
2. Dismounting the blind cover
by removing the M8 screw.
3. Position the enclosed air
connecting
4. And screw tight, with the M8
screw.
3. Technical specification
3.1 Dimensional drawings
1
3
27
2
4