Télécharger Imprimer la page

Riello 468 M1 Instructions Pour Installation, Utilisation Et Entretien page 44

Publicité

Les langues disponibles
  • FR

Les langues disponibles

H
Remote lock-out signal
H1
Motor trip signal
IN
Optional switch on-off burne
MA Start-up terminal strip
MB Burner terminal strip
PS
Reset push - button
NOTE:
Check the lock-out by darkening the photo-cell after removal of the cover.
ATTENTION HIGH VOLTAGE.
In case of supply 230V without neutral, connect the pre-heater thank through delta (the "star" connection is
the original one, made for 400V).
NOTE
In systems where the run of wiring connecting the thermostat exceeds 20 metres in length, or in places where
the burner is subject to particularly disturbing electromagnetic interference (over 10 v/m), you must insert the
relay-interface kit item number 3010386.
5844
STAR-TIRANGLE START-UP
(to be carried out by the installer)
SA High temperature oil alarm
TL
Limit control device system
TS
Safety control device system
T2
Load control system for 2
T3
Load control system for 3
10
GB
~
~
D2625
230V
400V
A A gG/gL
63
50
2
B mm
10
6
2
C mm
6
4
2
D mm
4
2,5
nd
stage
rd
stage

Publicité

loading