Télécharger Imprimer la page

FONESTAR POWERBASS-8TB Mode D'emploi page 3

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
CEILING
The POWERBASS-CMB ceiling mount must be purchased.
-
FLOOR
4
5
WALL
1.- Drill 2 holes with Ø7 mm drill bit and fit the plugs and screws supplied.
NOTE: the screws must allow for the subsequent installation of the mount, so there must be a gap of
approximately 2-3 mm between the wall and the screw.
4x30
Ø 7
6
2.- Remove the legs at the top and replace them with the wall brackets using the hardware provided.
M4x15
6
1
M4x15
2 3
4
5
2-3 mm
- 3 -
EN
6
M4x15

Publicité

loading

Ce manuel est également adapté pour:

Powerbass-8tn