PLEASE READ THESE INSTRUCTIONS THOROUGH
LY BEFORE INSTALLATION
CAUTION
P
The operations described in this manual must only be
performed by qualified specialist personnel.
Set up for preinstallation
Refer to the pre-installation information enclosed with the product
(for work to be done in preparation for installation of the product
and wiring diagrams) and to what is indicated below:
Check that the following connections have been provided
(Alimia, Sienna, Virginia, Enjoy:
Pro:
2; mod. Virtus Pro:
- connection to the plumbing network and to the ground drain-
age points;
- hydraulic connections between the hot-tub, spa-pack (and
conpensation tank for the Alimia, Sienna, Virginia, Enjoy, Virtus
Pro without integrated compensation tanks models).
- installation of a water softener (upstream from the hot-tub) if
the water is very hard.
- connecting the buttons and the spotlight (refer also to chapter
"Connections and electrical safety);
- (Alimia, Sienna, Virginia, Enjoy, Virtus Pro models) electrical
connections between the compensation tank and the electrical
box of the (also refer to the chapter on connections and electri-
cal safety);
- connection of the electrical box installed on the spa-pak with
the electrical system of the building. The main disconnecting
switch is to be placed in a safe location that is accessible to users
(also refer to the chapter on connections and electrical safety);
For outdoor installation, it is advisable to drain the ducts
for the plumbing lines, or for the electrical cables, as well as any
inspection corridors, to prevent water accumulation. In cold ar-
eas, to prevent damage from freezing, provide valves for total
drainage of the pipes for connection to the spa-pak, to be placed
at their lowest point (Alimia, Sienna, Virginia, Enjoy:
3, 3a part. 32; Profile Pro:
2c part.11).
For indoor installation, it is necessary to remember that
water evaporation from the hot-tub (especially where high tem-
peratures are involved) can cause very high levels of humidity.
Natural or forced ventilation helps to maintain personal comfort
and reduce damage to the building.
Jacuzzi Europe refuses all responsibility for any damage caused
by excessive humidity.
Consult a specialist for indoor installation.
Jacuzzi Europe S.p.A. © 2023
2, 2a, 3, 3a; mod. Profile
2a, 2b, 2c):
2 part. 14; Virtus Pro:
NOTE: pipes and ball valves in PVC (with a suitable diameter for
the pipes) for the connection of the tub to the spa-pak and to the
compensation tank are not supplied by Jacuzzi Europe S.pA., since
the quantity depends on the type of installation.
Instructions for installation
G
ENERAL NOTICES
The hot-tubs are carefully packed in wood crates that ensure
protection during transport. Jacuzzi shall not be held liable for
damage incurred during transport or intermediate storage.
As soon as you receive the hot-tub, it is therefore important to check
that the packaging is in perfect condition and if not, immediately
notify the forwarding agent.
Remove the hot-tub from its packaging. During all subse-
quent handling and positioning, hold it only by the edges and
NEVER by the plumbing pipes.
The hot-tub is quite heavy. Therefore it is advisable to carry
out movement with suitable equipment and due care.
Always use protective gloves.
Carefully inspect the hot-tub before proceeding with instal-
lation, checking the correct position of the couplings, pipes and
clamps (check that they are not loose).
The installer must select pipes of a suitable diameter and
limit curves as much as possible (using PVC flexible pipes as nec-
essary) to minimize pressure drops. It is also advisable to install
a suitable number of PVC ball valves (Alimia, Sienna, Virginia,
Enjoy:
2, 2a, 3, 3a; Profile Pro:
2c) to make maintenance easier, without having to drain the
hot-tub (see disassembly of filter, pumps, replacement of system
connection pipes, etc.).
P
OSITIONING THE HOT TUB
2, 2a,
Set the tub on a surface that will support its weight.
2a, 2b,
(Alimia, Sienna, Virginia, Enjoy models
frame of the hot-tub is equipped with adjustable metallic feet
which are positioned to allow height adjustment and levelling
of the tub.
NOTE: all of the feet must rest on the floor and be attached to
it.
(Alimia, Sienna, Virginia, Enjoy models
A/B) The hot-tub also has supports that can be placed on the
edges of the overflow channel and which are able to support the
27
2; Virtus Pro:
2a, 2b,
2, 2a, 3, 3a) The
2, 2a, 3, 3a - det.
Jacuzzi Europe S.p.A. © 2023