Télécharger Imprimer la page

Electrolux CAL61.206 Instructions D'utilisation page 14

Publicité

Les langues disponibles
  • FR

Les langues disponibles

It is the responsibility of the installer of this system to review
each RV/caravan floor plan and determine the following:
A. Duct size;
B. Duct layout;
C. Register size;
D. Register locations;
E. Thermostat location.
These items must be determined in conjunction with the air
distribution system sizing and design requirements listed
in Section 3 of this manual.
ALTERNATE CONFIGURATIONS AND METHODS
MAY BE USED WHICH STILL ALLOW THE AIR
CONDITIONER TO OPERATE PROPERLY. HOW-
EVER, THESE ALTERNATE METHODS MUST BE
APPROVED IN WRITING BY THE MANUFACTURER.
The following instructions are based upon the use of
Return Air Kit No. 3105023 and Relay Kit No. 3104765.
The Relay Kit has mounting bolts supplied to tie the air
conditioner to the roof of the RV/caravan.
OPENING PREPARATION
A.
ROOF & CEILING
BE ELECTRICAL WIRING BETWEEN THE
THERE MAY
ROOF AND THE
CEILING. DISCONNECT ALL POWER
SUPPLIES AND THE POSITIVE (+) TERMINAL FROM
THE SUPPLY BATTERY. FAILURE TO FOLLOW THIS
INSTRUCTION MAY CREATE A SHOCK HAZARD.
UNPLUG ALL
POWER TO COACH
DISCONNECT
BATTERY
TURN OFF
GENERATOR
SETS
14
1. A 14"/355mm square opening must be cut through
the roof and ceiling of the RV/caravan. This opening
must be located between the roof reinforcing
members.
2. Mark a 14"/355mm square on the roof and carefully
cut the opening.
3. Using the roof opening as a guide, cut the matching
hole in the ceiling.
CUT HOLE
4. The opening created must be framed to provide
adequate support and prevent air from being drawn
from the roof cavity. Lumber 3/4"/20mm or more in
thickness must be used. Remember to provide an
entrance hole for power supply wiring and thermo-
stat wires.
LEAVE ACCESS FOR
POWER SUPPLY WIRIN
ELECTRICAL
LINES
FRAME OPENING SO IT
WON'T COLLAPSE WHEN
BOLTING DOWN APPLIANCE

Publicité

loading

Ce manuel est également adapté pour:

Cal136.206