Télécharger Imprimer la page

Assa Abloy effeff 843G Notice De Montage page 33

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Tab. 3 :
Six test runs
in test mode
Electrical connection
Test mode
Six tests are run through one after the other.
The next test is started by switching DIP switch 4. DIP switch 4 may only be
switched when a test run has been fully completed.
Test run
1
Maximum number
of operating cycles
reached
2
Motor test
(3 test runs)
3
Mains receiver
(10 seconds)
4
Control input 1
5
Control input 2
6
Sensor test
Signal after test run
If the green LED is lit, the maximum number of
operating cycles is reached.
If the green LED lights up uninterrupted, no error
has been identified.
If the green LED lights up uninterrupted, no error
has been identified.
The green LED lights up if voltage is applied on
control input 1.
The green LED lights up if voltage is applied on
control input 2.
The green LED lights up if the magnet sensor sig-
nals that the door is closed.
33
EN

Publicité

loading