Location Requirements; Product Dimensions - Haier HCH2400ACB Instructions D'installation Et Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

LOCATION REQUIREMENTS

IMPORTANT: Observe all governing codes and ordinances.
Have a qualified technician install the range hood. It is the installer's responsibility to
comply with installation clearances specified on the model/serial rating plate. The
model/serial rating plate is located behind the left filter on the rear wall of the vent
hood.
Vent hood location should be away from strong draft areas, such as windows, doors
and strong heating vents.
Grounded electrical outlet is required. See "Electrical Requirements" section.
FOR MOBILE HOME INSTALLATIONS
The installation of this range hood must conform to the Manufactured Home
Construction Safety Standards, Title 24 CFR, Part 328 (formerly the Federal
Standard for Mobile Home Construction and Safety, Title 24, HUD, Part 280) or when
such standard is not applicable, the standard for Manufactured Home Installation
1982 (Manufactured Home Sites, Communities and Setups) ANSI A225.1/NFPA
501A, or latest edition, or with local codes.

PRODUCT DIMENSIONS

38⁹⁄₁₆ " (98.0 cm) -
57⅛ " (145.0 cm) Max.
6
11¹⁵⁄₁₆ "
10⅜ "
(30.4 cm)
(26.4 cm)
24 " (60.0 cm)
30 " (76.0 cm)
21⁷⁄₁₆ "
(54.5 cm)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hch3400acb

Table des Matières