INSTRUCTIONS TO MOVE THE BOTTLE FILLER & BASIN
TO THE LEFT SIDE (NON-REFRIGERATED) FOR ALTERNATE MOUNTING
Using a 5/16" socket, remove
the (4) screws from the bottom
of each cooler to remove the
wrappers.
Refrigerated Cooler side:
Carefully lift and tip the shroud/basin
assembly off of the cooler frame.
Only disconnect the (2) black wires
coming from the shroud assembly that
go to the solenoid valve and to the cold
control.
Disconnect the water line at the solenoid
valve. Reference (Fig. 15, Pg.19) for the
operation of the quick connect fi ttings.
Non-Refrigerated Cooler side:
Carefully lift and tip the shroud/basin
assembly off of the cooler frame.
Only disconnect the (2) black wires
coming from the shroud assembly going
to the solenoid valve and to the power
cord.
Disconnect the water line at the solenoid
valve. Reference (Fig. 15, Pg.19) for the
operation of the quick connect fi ttings.
1000005927 (Rev. B - 01/21)
EZOTL8WS*1A LZOTL8WS*1A
VERSATILE BI-LEVEL
Using a #T20 (6 point star bit),
loosen the shroud screws.
Both sides, both coolers.
Page 14
ONLY move the fi ller panel and j-clip
to the refrigerated (right) side
if right side will be mounted 'high'.