Télécharger Imprimer la page

Glacier bay HD873X-0701 Guide D'installation Et D'entretien page 9

Robinet de baignoire et douche à manette unique

Publicité

Les langues disponibles

Les langues disponibles

Installation (continued)
5
Flushing the water outlets
and checking for leaks
Place the handle (F) on the valve body (D)
inverter and turn the handle (F) to the full on
mixed position. Turn on the hot and cold water
supply lines and allow the water to ow from
the outlets for one minute, or until all foreign
matter has been ushed out. Check for leaks.
Shut off the water at the faucet and supply
lines. Remove the handle (F).
D
F
6
Installing the plaster guard
Place the plaster guard (L) onto the valve body (D)
and secure with the screws (K).
NOTE: Be sure to position the plaster guard (L) correctly
onto the valve body (D), with the side marked "SHOWER"
facing upward.
K
L
9
Please contact 1-855-HD-GLACIER for further assistance.
D
HOMEDEPOT.COM

Publicité

loading

Ce manuel est également adapté pour:

Hd873x-073510032174641003217466304685899304685508