Ensure a location where:
a) Drainage can be done easily.
b) Convenient for wiring and piping.
c) Which have enough space for installation and service work.
d) Where no risk of flammable gas leakage.
e) When free from any obstacles in path of cool air discharge and warm air return and must allow spreading of air throughout
the room (near the center of the room).
f) Must be provided clearance for indoor unit from the wall and obstacles as shown in figure below.
g) The installation place must be strong enough to support a load 4 times the indoor unit weight to avoid amplifying noise
and vibration.
h) The installation place (hanging ceiling surface) must be assuring levelness and the height in the ceiling is 350mm or
more.
i) The indoor unit must be away from heat and steam sources (avoid installing it near an entrance).
Unit Installation
990.0mm
880.0~990.0mm (Ceiling Opening Site = 890mm)
770.0mm (Hanging Rod)
Unit Hanging
Indoor Unit
All manuals and user guides at all-guides.com
NOTE
Be sure to discuss the ceiling drilling work with the
installers concerned.
Piping Direction
Ceiling
Board
30.0mm
1-6
Measure and mark the position for the hanging rod. Drill
the hole for the angle nut on the ceiling and fix the hanging
rod.
The installation template is extended according to
temperature and humidity. Check on dimensions in use.
The dimensions of the installation template are the same
as those of the ceiling opening dimensions.
Before ceiling laminating work is completed, be sure to
fit the installation template to the indoor unit.
Confirm the pitch of the hanging rod is 770mm × 622mm
sharp.
Hold the unit and hang it on the hanging rod with the nut
and washer.
Adjust the unit height to 30.0mm between the indoor unit
bottom surface and the ceiling surface.
Confirm with a level gauge that the unit is installed
horizontally and tighten the nut and bolt to prevent unit
falling and vibration.
Open the ceiling board along the outer edge of the paper
installation template.