Checking the installation
Check the following items:
1.
Status of the main control board LEDs and of the other control elements connected.
2.
The main control board LEDs indicating the opening of motorized elements light up in
sequence.
3.
Power supply to wired and wireless thermostats.
EN
Blinking
Steady
Switches
A (M1 ... M6)
A (M1 ... M6)
Damper
opening
Damper
closing
9