Télécharger Imprimer la page

NuTone ALLURE WS2 Serie Instructions D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

PREPARE THE HOOD
4
Remove either top or back wiring knockout and install
approved Electrical Cable Clamp.
Ducted Installation - Skip to Step 11
The following Steps (5 thru 10) are for
NON-DUCTED INSTALLATION ONLY.
(3) #8 SCREWS
(2) #8 SCREWS
5
Remove Light Panel - held in place with (3) #8 screws and
(2) #8 screws. Disconnect light assembly wire harness
(white connector).
All manuals and user guides at all-guides.com
ELECTRICAL
CABLE CLAMP
.
LIGHT
PANEL
PREPARE THE HOOD
AIR CHUTE
6
Remove Air
Chute - held in
place with one
(1) screw.
NOTE: Be
careful not to
disconnect any
wires.
7
Remove Baffle
from air chute.
Tabs will
disengage
from Slots.
8
Rotate baffle. Reinsert
baffle into air chute (as
shown) so that baffle
fits all the way into
into air chute. An
audible "click" will
be heard when
fully installed.
This will direct
air flow through
the non-ducted
slots on top
of hood.
9
Re-install air chute and screw,
re-connect wire harness, and replace light panel.
NOTE: Be careful not to trap wires between Support Fin
and light panel.
ALLURE
®
WS2 SERIES
RANGE HOOD
Page 3
BAFFLE
TABS
SLOTS
SUPPORT FIN

Publicité

loading