Télécharger Imprimer la page

Sierra Flame AUSTIN-65G-NG-DELUXE Manuel D'installation Et Guide De L'utilisateur page 29

38,000 btu, gaz naturel et propane

Publicité

Vertical Installations
Always maintain a 1" clearance around the vent pipe (vertical) and 1" clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
When passing through a flat ceiling install a Box/Wall thimble. Cut a 9" square hole and frame as shown in
the diagram below.
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
CONSULT DURAVENT PARTS LIST OR SIERRA FLAME'S FIREPLACE MANUFACTURING PARTS
FOYER Duravent CONSULT LISTE DES PIÈCES OU SIERRA FLAME de fabrication LISTE DES
See section 3.3.4 Venting for instructions on how to connect Security or Dura-vent
venting.
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
9" x 9" opening
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
varier d'ÉTAT (PROVINCE).
LIST FOR PART NUMBERS.
PIÈCES DE RÉFÉRENCE.
Page 29 of 54

Publicité

loading