Télécharger Imprimer la page

Porter Cable CPFAC2600P Mode D'emploi page 12

Masquer les pouces Voir aussi pour CPFAC2600P:

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
Drain Valve:
The drain valve
is located at
the base of the
air tank and is
used to drain
condensation at the end of each use.
Check Valve: When the air
compressor is operating, the check
valve is "open", allowing compressed
air to enter the air tank. When the
air compressor reaches "cut-out"
pressure, the check valve "closes",
allowing air pressure to remain
inside the air tank.
A09777
2.
Plug the power cord into the
correct branch circuit receptacle.
(Refer to Voltage and Circuit
Protection paragraph in the
Installation section of this
manual.)
3.
Open the drain valve (counter-
clockwise) fully to permit air to
escape and prevent air pressure
build up in the air tank during the
break-in period.
4.
Move the On/Off switch to ON (I)
position. The compressor will start.
5.
Run the compressor for 15
minutes. Make sure the drain
valve is open and there is minimal
air pressure build-up in tank.
6.
After 15 minutes, close the drain
valve by turning clockwise. The
air receiver will fill to "cut-out"
pressure and the motor will stop.
The compressor is now ready for use.
12 - ENG

Publicité

loading

Ce manuel est également adapté pour:

Cfbn220