Télécharger Imprimer la page

Enerpac IC-30 Fiche D'instructions page 3

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4
All electrical wiring must be performed by a qualified
electrician and should be in accordance with local
electrical codes.
4.0 PRESSURE SETTING ADJUSTMENT
1. To adjust pressure setting, first loosen set screws
on the adjustment sleeve. (See Figure 1.) Secure
hex body with open end wrench. Turn adjustment
sleeve by hand clockwise to increase or
counterclockwise to decrease set point.
2. Once you have set the pressure switch, tighten
the set screws on the adjustment sleeve.
Notes:
1. Apply Loctite hydraulic sealant or
Teflon tape to NPT threads.
2. Assemble as shown.
3. Torque to 45-55 ft.-lbs. [60-71] Nm.
PSCK11
PSCK12
WM11, 12 Manifolds
*See Notes
Figure 3, Assembly of PSCK11 and PSCK12 to WEN Series Global
Connect to Pump
Electrical Box
Workholding Pump Manifolds WM11, 12, 41 and 61
WARNING: Pressure switch equipped
systems should include relief valves set
slightly above switch setting. Failure to do
this could result in personal injury and/or
equipment damage in the event of switch failure.
Connect to Pump
Electrical Box
*See Notes
WM41, 61 Manifolds
3
CAUTION: Use minimum torque
when tightening set screws.
PSCK11
PSCK12

Publicité

loading

Produits Connexes pour Enerpac IC-30

Ce manuel est également adapté pour:

Ic-31Ic-50Ic-51Psck11Psck12