Approved Uhp And Run Flat Tyre Demounting And Mounting Procedure - SICE S 1000 Manuel D'instructions

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

NOTE: If the tyre is particularly soft, the first
bead can be mounted with the mounting tool
positioned on the lower trolley to the side of the
bead breaker disc.
- place the tool in the work position by pulling
out the specific knob (see Fig. 24a - 24b);
- operating the
tool in order to move it near the upper rim edge
(see Fig. 24c);
- manually adjust the tyre so that the upper
shoulder of the rim passes the lower bead and
goes into the well (Fig. 24d);
- keep the section of the tyre with the lower bead
not yet inserted in the rim partially depressed
and press the
until the first bead is completely inserted;
- operate the
tool to the rest position;
- return the lower bead breaker disc to position
using the specific knob (see Fig. 24a).
5.5. APPROVED UHP AND RUN
FLAT TYRE DEMOUNTING AND
MOUNTING PROCEDURE
For this type of tyre please refer to the instructions
in the manual prepared by WDK (German Tyre
Industry Association).
User manual S 1000
control, lift the mounting
pedal to start rotation
lever to move the mounting
24a
24b
UK
24c
24d
135

Publicité

Table des Matières
loading

Table des Matières