Unibox T RTL
NOTICE
Risk of damage due to lubri-
cants!
Seals may be destroyed by greasing
agents or oil.
f Do not use any greasing agents or
oil for the installation.
f Flush any dirt particles or grease
or oil residues out of the pipework
before installing the product.
f When selecting the operating fluid,
please take the latest develop-
ments in technology into account
(e.g. VDI 2035).
1
2
3
4
5
6
7
Illustr. 7: Installation cross section
(1)
Masonry
(2)
"Unibox T RTL"
(3)
Plaster
(4)
Pipe conduit unit (separate accessory)
(5)
Edge insulating strip (separate acces-
sory)
(6)
Screed
(7)
Protective tube (separate accessory)
102273380-V01.06.2019
6.2 "Unibox T RTL" installation
The "Unibox T RTL" must always
be located at the end of the surface
temperature balance circuit (see 3.3
on page 28).
5
4
Illustr. 8: Connection
(1)
Radiator
(2)
"Unibox T RTL"
(3)
Surface temperature balance circuit
(4)
Supply
(5)
Return
1. Create a branch off from the supply pipe of
the two pipe heating system.
2. Lay the surface temperature balance
circuit.
Lay the heating circuit in a spiral
pattern to achieve an even heat
distribution.
3. Remove the protection cover of the valve
and the front cover of the pipe conduit unit
(you must refit the protection cover and
front cover after commissioning) and insert
the "Unibox T RTL" into the pipe conduit
unit.
Installation
4
3
2
1
2
3
31