Section 2. Cleaner Specifications; Section 3. Assembly And Setup; Unpacking; Assembling The Transport Caddy - Polaris P825 Manuel Du Propriétaire

Masquer les pouces Voir aussi pour P825:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Page 4

Section 2. Cleaner Specifications

Control box
100-240VAC, 60 Hz
supply voltage
Supply voltage
30 V DC
Installed load
150 W max
Cable length
50 ft (15 m)
Cleaner size
16 x 16.5 x 10 in. (41 x 42 x 25 cm)
(WxDxH)
Weight of Cleaner
20 lbs. (9 kg)
Filtration
All-purpose filter canister
Cycle lengths
1.5 hr floor only; 2.5 hr floor/walls/waterline
The cleaner is a double-insulated product. A double-
insulated electrical appliance is one which has been
designed in such a way that it does not require a safety
connection to ground. The basic requirement for double-
insulation is that no single failure can result in dangerous
voltage becoming exposed so that it might cause an
electric shock and that this is achieved without relying on
an earthed (grounded) metal casing. This is achieved by
having two (2) layers of insulating material surrounding
live parts or by using reinforced insulation. Therefore,
devices having double-insulated construction, such as this
cleaner, do not utilize a grounded (three-prong) cord/plug.

Section 3. Assembly and Setup

3.1

Unpacking

The packaging should contain the following items:
Robotic cleaner and floating power cable
Control unit with power cord
Transport and storage caddy assembly components
(Figure 1)
(a) handle frame
(b) support blocks (x 2)
(c) wheels (x 2)
(d) wheel locking clips (x 2)
(e) wheel axle / hubcap (x 2)
(f) base unit
(g) caddy handle
x 2
B
A
F
Figure 1.
Transport Caddy Assembly Components
When unpacking the cleaner and its components:
Check to make sure each component is in the box.
Check cleaner and components for damage.
If there are missing parts or damage, contact
Polaris Technical Support:
USA 1-800-822-7933
Canada 1-888-647-4004 .
3.2

Assembling the Transport Caddy

1.
Unscrew the handnut from the base unit
(Figure 2).
Figure 2.
Remove Handnut from Base Unit
2.
Insert the metal handle frame tubing into the
base unit with notch end at the top, then rotate
so the bends are away from you. (Figure 3).
x 2
D
C
x 2
x 2
E
G

Publicité

Table des Matières
loading

Table des Matières