STEP 17 (optional):
(Pieces: S x2, S-1 x2, T x2, T-1 x2)
NOTE: This step to be done only if curtains have also been purchased.
17.
Hang each piece of the screen curtain (S, S-1) and/or privacy curtain (T, T-1) from the hooks
(R) installed in Step 2, such that the curtain tie aligns with the leg (A), as shown below. When
not in use, the curtains may be gathered and tied around the legs.
NOTE: If both screen and privacy curtains are being installed, ensure that the privacy curtains
are on the outside.
FINAL NOTES (IMPORTANT):
Make sure all screws and bolts are tightened.
If conditions are windy, you may have to add cable guides at the corners and secure or temporarily
remove the curtains, if any.
456201.MARSEILLES 10X14.160209.GP.ENG.FR.HOM
HOM-HP
17