In this case, for gas operation, do not use the upper winter covering!
If even with draught-free installation a fume chimney is desirable, you must incorpor-
te the L100 ventilation and extraction system into the upper air vent opening.
Installation of fume chimney: please refer to point "6.7".
Deviations shall require the consent
of the manufacturer.
6.3
Ventilation and extraction
A correct installation is important for correct operation of the appliance to ensure,
there is no build-up of heat at the back of the appliance. This heat must be allowed
to escape into the open air.
In the event of high ambient temperatures, full performance of the cooling unit
can only be achieved by means of adequate ventilation and extraction.
Ventilation is provided for the unit by means of two apertures in the caravan wall.
Fresh air enters at the bottom, extracts the heat and exits through the upper vent
grille.
The upper ventilation grille should be positioned as high as possible above
condenser (A) .
The lower ventilation grille should be flush with the floor of the vehicle, allowing
any gas leakages (heavier than air) to escape directly into the open air.
If such an arrangement is not possible a hole must be provided under the refrigerator
(not close to the burner) so that any leaking LP gas can escape. This must have an
effictive area of at least 13cm²[2inch²]. It is desirable to fit the hole with wire mesh or
similar, and an angle plate to protect it from stones, mud etc., the wire mesh must not
reduce the effective area of 13cm² [2inch²] .
The ventilation grilles must have an open cross-section of at least 250cm².
This is reached using the Dometic Absorber Ventilation and Air Extraction
System L100 / L 200 that has been tested and approved for this purpose.
Comment:
If the distance between the wall and the refrigerator is greater than 20mm [3/4"] the
gap can be reduced to 20mm [3/4"] by fitting a suitable baffle piece.
Correct mounting of the lower ventilation grille facilitates the access to
the electrical and gas connections during maintenance work.
3/4"
20