LUND 900122 Instructions D'installation page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Steps
Snap Rail Shown, Seal & Peel Rail Similar
4
Center the frame on the truck. Next, center the frame from side to side.
Vehicle Not Equipped With Utility Tracks
For ease of installation the side rails have
been marked with the clamp locations.
Place a clamp centered at each of the
locations marked on the side rails.
Insert the upper clamp all the way into the
side rail and tighten the upper bolt with the
allen wrench (G) provided.
5
Vehicle Equipped with Utility Tracks
Follow the manufacture's instructions for removing the plastic utility track caps from the rear end
of both side tracks.
5A
B
C
PAGE 3 of 8
1703142E
Rev.2
G
C
For application with bedlin-
ers, refer to bed liner
J
instruction in step 9

Publicité

Table des Matières
loading

Table des Matières