In order for the C/L drain pipe to be mounted, the
table must be set up with a certain clearance to
the wall or have an appropriate cut-out for the pip-
ing of the C/L drain (please refer to set-up instruc-
tions).
▷ Position the Ceramill Motion 2 on the table.
▷ Adjust the height of the machine by screwing
the feet in or out, ensuring that the machine is
positioned firmly on all four feet.
▷ Mount the service unit (please refer to page 62).
▷ Remove the C/L container of the Ceramill Cool-
stream (please refer to section 8.2 on page 77).
▷ Fill Ceramill Coolant into the C/L container
(please refer to section 8.5 on page 79).
▷ To reinstall the C/L container (please refer to
section 8.6 on page 80).
NOTE:
Possible damage of the electric lines and the C/L
supply line:
▷ When moving the Ceramill Coolstream, pay
attention that no lines are driven over.
I N S T A L L A T I O N
▷ Move the Ceramill Coolstream below the table in
such a manner that it is aligned with the
Ceramill Motion 2.
4
4
Fig. 10
1 Ceramill Motion 2
2 Ceramill Coolstream
3 Connection for C/L return pipe
4 C/L drain pipe
▷ Connect the C/L supply line to the Ceramill
Motion 2 and to the Ceramill Coolstream.
▷ Plug the C/L drain pipe [4] together and con-
nect it to the Ceramill Motion 2 and the Ceramill
Coolstream (please refer to set-up instructions).
▷ Insert the extraction hose of the extraction sys-
tem being used (e.g. Ceramill Airstream) to the
extraction connection ([15] in Fig. 3 on page 53)
on the rear side of the Ceramill Motion 2.
1
3
2
61
E N