Ceramill Motion 2 set-up directly on the
Ceramill Coolstream (tower version)
A clearance of at least 200 mm is to be observed
sidewards, to the rear and upwards. Minimum
space requirements for the Ceramill Motion 2 on
the Ceramill Coolstream (incl. connections):
_ Height: 1,620 mm
_ Width: 920 mm
_ Depth: 860 mm
The set-up location must be level.
≥ 200
Fig. 7
1 Ceramill Motion 2
2 Ceramill Coolstream
NOTE:
Possible damage of the electric lines and the C/L
supply line:
▷ When moving the Ceramill Coolstream, pay
attention that no lines are driven over.
520
≥ 200
1
2
I N S T A L L A T I O N
▷ Place the Ceramill Motion 2 onto the Ceramill
Coolstream, ensuring that the adjustable legs
engage into the retainers.
▷ Mount the service unit (please refer to page 62).
▷ Remove the C/L container of the Ceramill Cool-
stream (please refer to section 8.2 on page 77).
▷ Fill Ceramill Coolant into the C/L container
(please refer to section 8.5 on page 79).
▷ To reinstall the C/L container (please refer to
section 8.6 on page 80).
▷ Connect the C/L supply line to the Ceramill
Motion 2 and to the Ceramill Coolstream.
3
Fig. 8
1 Ceramill Motion 2
2 Ceramill Coolstream
3 C/L drain pipe
▷ Plug the C/L drain pipe [3] together and connect
it to the Ceramill Motion 2 and the Ceramill
Coolstream (please refer to set-up instructions).
▷ Move the Ceramill Coolstream with the Ceramill
Motion 2 to the set-up location.
▷ Lock the casters of the Ceramill Coolstream
with the brakes.
E N
1
2
59