1
Module terminator
3
Module-to-module cable
Powering On the Library
1 Turn on each power supply's power switch.
2 Turn on the library's main power using the power button located on the front
of the 5U Library Control Module.
The Setup Wizard screen appears on the operator panel when the library has
completed its power-on self-test (POST) and initialization. This process takes
approximately 30 minutes. Do not power off the library during this process.
2
4
Dell PowerVault ML6000 Getting Started Guide
Ethernet cable connected to Gigabit
Ethernet port
Power cords
19