Impeller Replacement - Pentair BERKELEY B85580 Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Remove the volute and the old gasket(s) and O-Ring(s).
Discard the gaskets and O-rings.
Note:
A hexnut placed between the
jackscrew and shaft end will
prevent damage to the shaft
and impeller screw threads.
2. Remove the impeller: Pull keyed impellers off the shaft
with a standard gear puller against the end of the shaft and
pulling on the impeller.
BE839
Maintenance

Impeller Replacement

Clockwise Rotation
Volute shown.
5787 0208
• Check the clearance between the impeller hub and
the volute wear ring. If it is more than .020" on a side,
replace the wear ring.
Gear Puller
Fingers behind
Impeller Vanes
Key
Gear Puller
Jackscrew
5788 0208
NOTE: Place the puller's fingers against the vanes in the
impeller. Pulling on the impeller's unsupported back shroud
could easily break the impeller.
Page 21

Publicité

Table des Matières
loading

Table des Matières