Starting the dryer

a) Use the switch or on button to start the dryer.
b) Always start up the dryer before activating the air compressor.
c) Set the main disconnect switch (QS) to ON so that the green line lamp illumi-
nates.
d) Wait about 5 minutes until the dryer is running at the correct operating tempera-
tures and pressures.
e) Slowly open the air inlet valve to pressurise the dryer.
f) Slowly open the air outlet valve. The dryer is now operating (drying).
g) Always leave the dryer running while the air compressor is operating.
h)
After stopping the dryer wait at least 3 minutes before starting it again.
3.3

Stopping the dryer

a) Use the switch or off button to stop the dryer.
b) Stop the dryer 2 minutes after shutting down the air compressor or interrupting
the air flow to the dryer.
Avoid allowing compressed air to enter the dryer when the dryer is
switched off or when it is in an alarm situation which stops the refrigeration
compressor.
3.4

Operation

S The dryer operates automatically. It is factory set for a dew point of 38˚F (3˚C)
(ISO 7183, Part 2) and therefore requires no further calibration.
S Do not exceed the machine's design limits, bypass excess air flow and check the
unit model and/or installation.
S For maximum performance from your dryer, follow the maintenance schedule de-
scribed in Chapter 4.
S The sound pressure level recorded for these dryers at 40 inch (1 metre) from the
machine in free field conditions) is less then 70 dB (A).
Fig. 5 shows the Dryer's refrigeration and air circuits.

4 Maintenance

Before accessing live electrical parts
dryer using disconnect switch QS or disconnect the cable connections.
SAFETY DEVICES
SK overload protector
ST high temperature thermostat
HP high pressure switch
COMPRESSOR TYPE
PISTON
(installed on models SR- 125)
ROTARY (installed on models SR- 150 -- SR- 200)
N.B.: Always use original spares supplied by the manufacturer.
Failure to do so renders the manufacturer not liable for incorrect unit operation.
4.1

Preventive maintenance

For optimum performance from your dryer follow the periodic maintenance sched-
ule described below.
CONDENATE DRAIN
CONDENATE DRAIN
WEEKLY
WEEKLY
See condensate drain manual supplied separately.
COMPRESSOR
Make sure the compressor head temperature is between 59˚F
MONTHLY
MONTHLY
(15˚C) and 203˚F (95˚C) when running. If this is not the case con-
sult Chapter 7.
CONDENSER
Remove any dust from the condenser fins.
EVERY 4 MONTHS
EVERY 4 MONTHS
COMPRESSOR
COMPRESSOR
Make sure compressor power consumption complies with data plate
specifications.
CONDENSATE DRAIN
YEARLY
Completely disassemble the drain and clean all its components.
Refer also to condensate drain manual supplied separately.