4. Transport ... / 5. Commissioning, operation
Store the instrument in its original packaging in a location that fulfils the
conditions listed above. If the original packaging is not available, pack
and store the instrument as described below:
1. Wrap the instrument in an antistatic plastic film.
2. Place the instrument, along with shock-absorbent material, in the
packaging.
3. If stored for a prolonged period of time (more than 30 days), place a
bag containing a desiccant inside the packaging.
Before storing the instrument (following operation), remove
any residual media. This is of particular importance if
the medium is hazardous to health, e.g. caustic, toxic,
carcinogenic, radioactive, etc.

5. Commissioning, operation

WARNING!
Avoid putting any mechanical loading on the electrical
connections and on the cases. Connections must only be
opened once the instrument has been depressurised and
has cooled down.
Maximum permissible temperatures:
At the case with transmitter: 85 °C [185 °F]
Class A:
Without neck tube -30 ... +150 °C [-22 ... +302 °F]
With neck tube -30 ... +250 °C [-22 ... +482 °F]
Class B:
Without neck tube -50 ... +150 °C [-58 ... +302 °F]
With neck tube -50 ... +250 °C [-58 ... +482 °F]
DANGER!
Danger to life caused by electric current
Upon contact with live parts, there is a direct danger to life.
The instrument may only be installed and mounted by
skilled personnel.
WIKA operating instructions model TR36
EN
13

Publicité

Table des Matières
loading

Table des Matières