6. Connect tubes 5 and 6 to tubes 3 and 4 using the bolts (26), washers (22) and nuts (28). Then
connect tubes 5 and 6 to tube 8 using the bolts (28), washers (22) and nuts (28) as shown in FIG.
4, 4A and 4B.
7. Connect tubes 7 and 8 to tube 2 using the bolts (24), washers (22) and nuts (28) as shown in
FIG. 4C. Repeat this step for the other side. NOTE: Make sure the spring lock is facing down.
6
24
-19-