8.
Take screw/cap and screw these into the pre-
drilled holes on either side of the post (Fig. 5).
9.
Take mailbox mount/bracket and measure on
bottom of mailbox, extending bracket out if
necessary.
Mark center of slot on either side indicating how
far pieces need to be extended (Fig. 6).
10.
Using
mailbox mount. Next, insert vinyl plug to hold in
place.
11.
Take mount and center it on the width of the
mailbox arm. Attach mailbox mount with 1
screws onto arm approximately 2" from the front.
12.
Place mailbox on top of bracket and screw
mailbox from the side to attach to the mount.
13.
Attach caps to top of mailbox and mailbox arm
(if applicable) using small amount of supplied
glue.
14.
Back fill hole with dirt.
4
⁄
" drill bit, drill your marked locations on
1
8
⁄
"
1
2
Fig. 5
Fig. 6