Barrette 34111811 Instructions D'installation page 3

Ensemble pour poteau de boîte aux lettres
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.
Use shovel or post hole digger to dig hole
in desired location. Dig hole 24" deep and
approximately 8" in diameter.
2.
Insert wood post into mailbox post sleeve,
leaving about 12" of wood out of the bottom of
the post sleeve.
3.
Using
1
wood post, about 1-2" from the bottom of plastic
post sleeve in center of post on adjacent sides.
Attach using a 1
posts in bottom locations (Fig. 1).
NOTE:
If installing #73028083, move on to Step 6.
4.
Before inserting arm into post, pre-drill post with
" drill bit centered horizontally on post where
3
16
arm is going to meet post (Fig. 2).
NOTE:
Pre-drill mailbox post ONLY, not arm.
5.
Insert arm into post sleeve, pushing through the
back of the post about 8".
NOTE:
If installing #73028086, insert brace into post
sleeve, then insert brace into mailbox arm.
Next, insert arm through post (Fig. 3).
6.
Insert mailbox post assembly into hole, always
checking to make sure post is level.
NOTE:
Please be sure that arm or top of post height
meets local code requirements.
7.
Once post is inserted, pour dry concrete into
hole, packing down around post. Pour small
amount of water into hole. For mailbox kits
#73028084, #73028085, and #73028086 proceed
to Step 8.
For #73028083 the next step is installing the
mount on top of the post. The two pieces of the
mount must slide together completely and not
extend out (Fig. 4). With the tabs facing down,
insert mount on top of post. Drill the two pieces
together and drill the sides. Proceed to Step 12.
" drill bit, drill a hole through the post and
8
" screws on adjacent faces of
1
2
Fig. 1
Fig. 2
Fig. 3
Fig. 4
3

Publicité

Table des Matières
loading

Table des Matières