Amount Of Coffee Programme - Ascaso BAR 1GR POD Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
ascaso
The installer must read this manual closely be-
fore start-up.
The operator should be an adult and fully com-
petent person.
Should any anomaly occur, please contact your
distributor.
Start-up
Check that the voltage is the same as that indi-
cated on nameplate of the machine.
Machine connected to the mains supply,
connect to the drainage pipe
Connect the machine to the water supply via
19
the flex,
leaving the tap open.
Machine with tank, fill the tank on the side
with a minimum of 3 litres
For both models
Connect the machine to the mains power sup-
ply and start up by turning the ON/OFF switch
0
to position 1 (coffee only) or 2 (coffee and
steam). The general ON/OFF pilot light will
00
come on
. Connect the coffee groups using
the switch (1).
Once this process has finished, the machine
will prepare itself for operation: The S-L-XL
8
buttons
will light up alternatively, indicating
that the coffee group is heating. Once it has
reached the preset temperature, all three will
remain lit.
Note. The buttons
will only be lit if the ON/OFF switches for
each group are switched on. If not, the S-L-XL
buttons will remain unlit.
If the general switch
4
boiler pilot light
will be lit, indicating that
the boiler is heating the water, until the ma-
nometer shows a pressure level of approx-
7
imately 1.5 bar
. The boiler will be ready
18
2
.
16
.
8
on each coffee group
0
is in position 2, the
to provide hot water and steam in about 20
minutes.
It is common for a little water to come out of the
10
nozzle
after setting the steam function run-
ning. We therefore recommend that you place
the nozzle in the drainage tray
Attention
If, for any reason, water does not reach the
boiler, the buttons will flash and the machine
will stop working.
In both cases, disconnect using the switch
and check the water supply, either from the
mains supply or manually fill, reconnect the
machine by turning the general switch to po-
sition 1 or 2.
We recommend using water with
a low mineral content. The quality of the
water will affect the taste and quality of the
coffee as well as help avoid future malfunc-
tions. Check out our special anti-limescale
filters (optional).
3.

Amount of coffee programme

Electronic button
S:
small coffee
L:
large coffee
XL: continuous (press again to discontinue
the dose)
To programme the amount of coffee, with the
1
machine on and ready to make coffee (the but-
8
tons will be
6 seconds on the XL programme until it flashes
and the S and L buttons remain lit.
Now press the selection you want (S or L),
which will flash while the L and XL will be off.
The delivery process will begin.
15
.
8
functions.
permanently lit), press for 5 or

Publicité

Table des Matières
loading

Table des Matières