Télécharger Imprimer la page

Site Requirements - RS Pro V9401 Feuille D'instructions

Système de rayonnage modulaire monorangé

Publicité

Les langues disponibles

Les langues disponibles

15
C
C
E
16
A. Solid cladding
A. Rivestimento solido
General
These instructions are designed to give an easy step by step guide to
assembling the single tier RS modular shelving system. Please read
through these instructions thoroughly before starting work as good
planning will help to make the assembly easier.
The RS modular shelving system has been designed as a fully
integrated system. Each module is based on a 1m wide bay that can
easily be added to whenever additional storage is required. With such
flexibility a wide range of layouts and designs may be created to
accommodate the smallest workshop to the largest stores or office.
The system is quick and easy to erect without the need for time
consuming nut and bolt assembly. All the major components are
manufactured from 18 s.w.g. steel and epoxy coated in either medium
or dark grey stove enamel.

Site requirements

The proposed site should have a reasonably level floor, small local
variations may be accommodated by the use of packing shims.
1
D
C
A
C
A
B
3
A
F
A. Recouvrement massif
RS Stock No.
231-226, 419-0781,
419-0797
2
1. C.V. Clip
1. C.V. Clip
2. Lock Mechanism
2. Meccanismo di
3. Fits at any height
within bay
3. S'installa a qualsiasi
The floor material should be concrete or any other suitable material
which can withstand the loading. The atmosphere and environment
should be reasonably dry to reduce the possibility of corrosion.
Fixing requirements
Whilst this system can be used without fixings, it is good practice to fix
it to the floor using suitable fasteners, e.g. Rowlbolts™ (loose bolt type
RS stock no. 525-341) and the fixing plates provided with the basic and
additional bay.
Size
M10 x 10
Features
Modular
Robust
Bolt-less construction system
Adaptable
Quick and simple assembly
Unit data
Overall height
Overall width
Overall depth
Shelf loading
Bay loading
*UDL = uniformly distributed load
Tools you may require
Although almost all components either slot or clip together, it may be
necessary to locate the C.V. (centrefour vertical) or upright clips using
a screwdriver. Other tools that may be handy include:
Spirit level
Small screwdriver
Small set of steps
Soft-headed hammer
1. Bride de C.V.
2. Mécanisme de verrouillage
bloccaggio
3. S'adapte à n'importe quelle
hauteur à l'intérieur du bâti
altezza entro il vano
Rawlbolt™ (RS stock no. 525-341)
Max fixing
Min hole
thickness
depth
10
65
2m
1m
330 or 500mm
35kg *UDL
945kg *UDL
V9401
Fitting hole
diameter
16
3

Publicité

loading