S&P JETLINE 100 Mode D'emploi page 12

Masquer les pouces Voir aussi pour JETLINE 100:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
comply with the requirements of the Euro-
pean Directive 2009/125 and must be insta-
lled following the local demand control de-
EN
fi nition given in the regulation nº1253/2014
(See the wiring diagram "B", as example).
START UP
• Check fan unit equipment name plate
data is appropriate to the location electri-
cal supply, especially Voltage, Frequency,
Phase, Amps, speed are correct.
• Check earth connections, electrical ter-
minations and terminal box lid, with any
seals, if fi tted, are correct.
• In compliance with Machine Directive,
if the fan unit is accessible to operators
and is a health and safety risk, adequate
protection must be fi tted, information for
safety equipment, including guards, can be
found in S&P accessories catalogue.
• Check all rotating parts have free, unobs-
tructed movement.
• Check there are no foreign bodies inside
the fan unit or that can be drawn into, or
fall into fan unit.
• Check the structure is complete and has
no damage. Check installation and area is
safe and energise fan unit and start motor.
• Check that the impeller and airfl ow direc-
tion is correct, and there are no unusual
vibrations.
• Check current does not exceed fan equip-
ment nameplate data.
• If any of the electrical safety devices blow,
the fan unit must be quickly disconnected
from the mains supply. The whole insta-
llation should be carefully checked before
trying to start up the fan again. After two
hours of operation, check that all fi xings
are tight and adjust if necessary.
MAINTENANCE
Maintenance/repairs must be carried out
by competent and local regulations. Fan
12
unit equipment should be electrically isola-
ted and locked out before any work started.
Fan unit equipment should be regularly clea-
ned, frequency depending upon service load
and application, but no less than every year.
Cleaning should include all areas where
dust can accumulate in the fan equipment.
Special attention should be made to any
unusual sounds, vibration or temperature.
If any problems are detected the fan unit
equipment should be stopped immediately
and cause inspected. The impeller and bla-
des should be regularly checked for damage
that could cause imbalance in the moving
parts.
RECYCLING
In accordance with EEC Standards
and our responsibility for future ge-
nerations, we are obliged to recycle
all the materials we can. Therefore,
please deposit all waste material
and packaging in their corresponding re-
cycling containers and hand in the replaced
units to the nearest handler of this type of
waste product.
The fan unit is mainly made of steel, copper,
ferrite, aluminium and plastic. These com-
ponents should be recycling in the following
categories:
- Steel and iron
- Aluminium
- Non-ferrous metals
- Plastics
- Insulating materials
- Cables
- Electronic scrap
To clarify any questions regarding S&P pro-
ducts contact your local distributor. For its
location and to obtain the EU Declaration
of Conformity certifi ed technical data sheet
and copy of this instruction manual, see our
web site www.solerpalau.com

Publicité

Table des Matières
loading

Table des Matières